Louis Vuitton
Internal refurbishment to a building with heritage listed features and high end finishes in difficult to reach places.
Highlights:
- Engineered scaffold solutions combined to create monorail lifting systems to get materials from ground floor to levels 1 and then 2. Monorail lifting capacity 1200kg.
- Scissor lifts were no longer able to be placed on the floors with the finishing trades work been completed. So we provided around the clock support in the final 2 weeks to finish the project using aluminium mobile scaffolds.
“Express Scaffolding designed a monorail system to lift our materials between floors, incorporating a stretcher-stair with limited space. Aluminium scaffolding was also necessary for finishing this job as it was lightweight and easy to move in small spaces. Express Scaffolding were extremely responsive, cooperative and a great partner in the delivery of this newly refurbished store.”
Looking for aluminium or lightweight scaffold and/or Swing Stages? We can help, contact us today